Fire Station 22

Location
Seattle, WA

Client
City of Seattle

Data
10,030 SF station
4 full-time employees

Projected Completion
August 2017


  • FS22 1240×800 (1) Park
  • 1240×800 (3) Night
  • 1240×800 (2) Front

This project is the last full-building replacement project under the 2003 Fire Facilities and Emergency Response Levy. The new station will provide drive-through access and numerous upgrades to meet current program standards.

The station is located at a complex nexus of neighborhoods and roads at the north end of Capitol Hill. Busy arterials wrap the station on two sides, with freeways creating a “canyon” on the other two sides. A proposed “lid” over SR-520, to the east of the site, will increase pedestrian exposure to the building in the future.

The station needs to mediate this complex site while maintaining rigorous programmatic requirements and balancing users’ desire for privacy. It does so with a sculptural facade along E. Roanoke Street, which provides privacy for the building’s users while creating pedestrian interest and texture. The station opens up to the future 520 Lid at the northeast corner, with a fully glazed lobby, the iconic Apparatus Bay egress doors, and a hose tower that acts as a landmark on the singular site.

Sustainability is an important aspect of the project; it is being designed for minimum LEED Gold Certification.

Illustration: © Weinstein A+U

One Response to “Fire Station 22”